| 1 | Match the Three-Phase Rating | Confirm the generator’s continuous and standby ratings in kW and kVA. Check the rated power factor and whether the load is balanced across all three phases. | kW = kVA × power factor A common rated power factor is 0.8. Avoid continuous operation above the manufacturer’s prime-power rating. | Correct sizing prevents overheating, voltage instability, nuisance shutdowns, and poor fuel economy. | Add running load, motor-starting demand, and future capacity. Review the load schedule and phase measurements. |
| 2 | Compare Fuel Efficiency | Compare fuel consumption at 25%, 50%, 75%, and 100% load rather than relying on a single maximum-load figure. | Typical diesel consumption is approximately 0.24–0.30 L/kWh at 75–100% load and may rise to about 0.35–0.50 L/kWh at 25% load. | Fuel cost is often the largest operating expense over the generator’s service life. | Request a fuel-consumption curve or test sheet using the same rating standard and fuel conditions. |
| 3 | Check Emissions Compliance | Verify the applicable emissions certification, including limits for nitrogen oxides, particulate matter, hydrocarbons, and carbon monoxide. | Requirements vary by location and engine power. Current regulations may require certification such as EPA Tier 4 Final or EU Stage V for applicable non-road engines. | Non-compliant equipment can face operating restrictions, additional permitting, or costly retrofit requirements. | Check the official certificate, engine family information, installation rules, and local air-quality regulations. |
| 4 | Evaluate Noise Level | Compare sound pressure levels for open-frame and acoustically enclosed configurations, including the measurement distance and operating load. | Enclosed sets commonly measure about 70–85 dB(A) at 7 m; open-frame units may be approximately 85–100 dB(A) at 7 m, depending on size and enclosure design. | Lower noise is important near homes, offices, hospitals, schools, and temporary work areas. | Request a certified sound test using a recognized measurement method and confirm local noise limits. |
| 5 | Calculate Required Runtime | Compare usable tank capacity with expected fuel consumption at the actual operating load. | Estimated runtime (hours) = usable fuel volume (L) ÷ fuel consumption (L/h). Example: 500 L ÷ 30 L/h ≈ 16.7 hours. | Adequate runtime reduces refueling interruptions and improves resilience during extended outages. | Use the supplier’s hourly fuel-consumption data and subtract reserve fuel that should not be used. |
| 6 | Review Load Acceptance | Check voltage and frequency recovery when large motors, pumps, compressors, or transformers start. | A generator should be assessed for transient performance, motor-starting kVA, voltage dip, and frequency recovery—not only steady-state kW. | Poor load acceptance can cause equipment trips, dimming lights, process interruptions, or failed motor starts. | Request transient test results and model the largest starting load and the planned load-sequencing strategy. |
| 7 | Assess Maintenance and Controls | Review service intervals, oil and coolant capacity, automatic transfer-switch compatibility, alarms, remote monitoring, and spare-parts access. | Preventive maintenance commonly includes regular inspections, oil and filter replacement, coolant checks, battery testing, and periodic load-bank testing; intervals depend on operating hours and the maintenance schedule. | Easy maintenance and clear diagnostics reduce downtime and total ownership cost. | Obtain the service manual, maintenance schedule, warranty terms, control-panel specifications, and emergency support details. |